IFS Applications 7.5


Multisite Planning

IFS/Multisite Planning™  manages materials and capacity planning over single or multiple sites, using planning networks, master schedules and supply/demand data. It generates action lists and messages with direct links to supply/demand details. Material and capacity data can be displayed graphically at various levels of aggregation. Master schedules can be produced in tabular or graphical formats, with multi-level scheduling allowing finished products with similar requirements to be arranged in product families.  Standard Sales & Operations Planning format is also supported.


 
Home | White Paper Library | Case Study Library | Advisory Council | About Us | Contact Us | Privacy Policy | Site Map
© 2008-2012, Top10ERP.org. All rights reserved.