ERP Software Systems Index for Manufacturing
Home >
ProcessPro® Premier > Master Production Scheduler
ProcessPro® Premier
Master Production Scheduler
The Advanced Scheduler application makes production scheduling simple and easy to understand. With user-friendly featuresusers are able to view/edit the batch ticket details directly from the scheduling screen, easily schedule machine downtime, identifybatch tickets with shortages and other helpful reporting features. User-friendly features include:
-
Batch Tickets with shortages are highlighted when the schedule is loaded initially.
-
The drag-and-drop capability allows users to move the batch tickets within the schedule.
-
Scheduler tracks the original customer required date for ontime performance reporting.
-
Multiple users are allowed to generate schedules at the same time.
-
The schedule can be viewed in a variety of different options: time increments,multiple days, or multiple work centers.
-
Batch Tickets can be locked in the schedule to prevent movement within the schedule.
-
Color coding provides a visual status of the Batch Ticket.
-
The Missing Component report can be generated after the schedule is created to confirm any Batch Tickets that can be produced.
-
Work center reports can be generated to provide a schedule to the line operators.
-
Work Center Hours schedule determines hour availability by day.
-
User can define the work center type.
-
The allocated time in the schedule is driven by the Set Up and Cycle Time on the route.
-
User can change Batch Ticket start dates and work centers with the click of a button.
-
Batch Tickets can be scheduled outside of the normal work day.
-
Equipment down time can be scheduled.