Solarsoft iVP


Maintenance
 

With its direct link to production activity, user defined PM procedures can be triggered for any machine, toll, fixture, asset or returnable container based on actual usage parameters. Additionally, all results of maintenance done are associated and booked directly to the General Ledger.

 

Preventative maintenance procedures can include a bill-of-materials, labour and outside contractor requirements; procedures can be initiated by the accumulation of setups, elapsed time, time in use, parts produced, machine cycles and trips.


 
Home | White Paper Library | Case Study Library | Advisory Council | About Us | Contact Us | Privacy Policy | Site Map
© 2008-2012, Top10ERP.org. All rights reserved.